Kale Care Chemicals 2nd Factory Construction
Project Date: 19.1.2025-17.11.2025
Employer: Kale Seramik
Project Summary
The Kale Care Chemicals 2nd Factory Construction Project, executed by Bulut Yeşil İnşaat, is a comprehensive factory construction developed to increase the firm’s production capacity and strengthen its modern industrial facility infrastructure. The project is designed in line with high-standard engineering solutions and the technical infrastructures required by industrial production facilities, and is progressing with principles of fast and safe implementation.
Project Information
- Project Date: 19.01.2025 – 17.11.2025
- Project Location:
- Employer:
- Contractor: Bulut Yeşil İnşaat
- Project Type: Industrial facility – factory construction
Project Scope
The project consists of industrial structural components designed to be compatible with modern production technologies:
- Construction of a factory building suitable for the new generation production line
- Industrial infrastructure and superstructure applications
- Facility preparation compatible with mechanical and electrical system infrastructure
- Landscaping and logistics area design
- Creation of a safe, durable, and long-lasting factory structure
Key Project Features
- Factory construction compliant with chemical and industrial production standards
- Structural infrastructure equipped with modern engineering solutions
- Site management tailored to a short project duration with fast setup planning
- Functional interior space planning supporting production processes
- Facility design compliant with security standards
- Infrastructure integration suitable for industrial needs
The Kale Care Chemicals 2nd Factory Construction is an industrial facility project designed with modern engineering solutions, planned for completion in a short period.