Kale Care Chemicals 2nd Factory Construction
Project Date : 19.1.2025-17.11.2025
Kale Care Chemicals 2nd Factory Construction

Kale Care Chemicals 2nd Factory Construction

Project Date: 19.1.2025-17.11.2025
Employer: Kale Seramik

Project Summary

The Kale Care Chemicals 2nd Factory Construction Project, executed by Bulut Yeşil İnşaat, is a comprehensive factory construction developed to increase the firm’s production capacity and strengthen its modern industrial facility infrastructure. The project is designed in line with high-standard engineering solutions and the technical infrastructures required by industrial production facilities, and is progressing with principles of fast and safe implementation.

Project Information

  • Project Date: 19.01.2025 – 17.11.2025
  • Project Location:
  • Employer:
  • Contractor: Bulut Yeşil İnşaat
  • Project Type: Industrial facility – factory construction

Project Scope

The project consists of industrial structural components designed to be compatible with modern production technologies:

  • Construction of a factory building suitable for the new generation production line
  • Industrial infrastructure and superstructure applications
  • Facility preparation compatible with mechanical and electrical system infrastructure
  • Landscaping and logistics area design
  • Creation of a safe, durable, and long-lasting factory structure

Key Project Features

  • Factory construction compliant with chemical and industrial production standards
  • Structural infrastructure equipped with modern engineering solutions
  • Site management tailored to a short project duration with fast setup planning
  • Functional interior space planning supporting production processes
  • Facility design compliant with security standards
  • Infrastructure integration suitable for industrial needs

The Kale Care Chemicals 2nd Factory Construction is an industrial facility project designed with modern engineering solutions, planned for completion in a short period.